To further increase the energy efficiency of this building materials manufacturer, Ceratec installed 320 solar panels on its office building in Ploegsteert.
- Quantity of panels : 320
- Power per panel : 405Wp
- 1 transformer : 110 KVA – SMA CORE2
- Estimated annual return : 117 MwH
The photovoltaic plant is taking a new step in greening their energy consumption and increasing their own energy production, after Ploegsteert previously commissioned 14 charging points and installed cogeneration.



