Ceratec was asked to renew the HS8 cabin at BiG’s Wielsbeke site.
Schneider Electrics’ new SM6 cells (medium voltage) power a brand-new 2,500 KVA transformer, to which a 4,000 A busbar has been connected, and linked to a low-voltage cabinet no less than 8 m long.
The entire project took just 2 weeks, including preparation work in our wiring workshop.