US Tile: Corona (USA)
The 2 production lines, including the dryer, were to be replaced. The guidelines for the project were:
- maintain the layout of the two stretching machines, the cutter and the tile press
- install new handling equipment
- install a new dryer
- feed dry tiles into the existing four-storey roller kiln.
All these conditions were met by loading the stretched and pressed tiles onto racks and conveying them to a tunnel dryer. The two production lines operate alternately, using the same dryer car loading system.