The existing warehouse for storing cardboard and plastic film has been automated for the Neuve Eglise and Warneton sites.
Packs are stored in the automatic warehouse from the loading docks. Packs are then distributed to the various production lines on demand.
Specific to this project :
- Integration of the Stow 2D shuttle


