...

Westpark Furnes

The Westpark in Veurne was completed in just nine months. The one-hectare shopping complex houses 9 stores.

The business park is a model of sustainability. Ceratec installed the following solutions:

  • 1000 kVA high-voltage cabinet + general low-voltage panel
  • Controlled outlets (e.g. for Christmas lights)
  • 9-store power supply with energy control
  • Data wiring
  • Camera surveillance
  • Lighting: exterior lighting, emergency lighting and logo power supply.
  • Load posts with load balancing

Project information

References with the same solutions