The Westpark in Veurne was completed in just nine months. The one-hectare shopping complex houses 9 stores.
The business park is a model of sustainability. Ceratec installed the following solutions:
- 1000 kVA high-voltage cabinet + general low-voltage panel
- Controlled outlets (e.g. for Christmas lights)
- 9-store power supply with energy control
- Data wiring
- Camera surveillance
- Lighting: exterior lighting, emergency lighting and logo power supply.
- Load posts with load balancing




