US Tile
New production line with tunnel dryer
US Tile
New production line with tunnel dryer
US Tile: Corona (USA)
Both production lines, including the dryer, had to be replaced. The directives for the project were to:
- preserve the installation of the two augers, cutters and the tile press
- install the new handling equipment
- install a new dryer
- feed the dry bricks into the existing four-level, roller-hearth kiln.
All these conditions were respected by loading the tiles stretched and pressed on trays and by routing them to a tunnel dryer. Both production lines work alternately and use the same dryer cars loading system.