{"id":18581,"date":"2026-02-24T16:27:27","date_gmt":"2026-02-24T14:27:27","guid":{"rendered":"https:\/\/ceratec.eu\/?post_type=reference&#038;p=18581"},"modified":"2026-02-24T16:29:12","modified_gmt":"2026-02-24T14:29:12","slug":"retrofit-of-le-generator-at-walibi-rhone-alpes","status":"publish","type":"reference","link":"https:\/\/ceratec.eu\/en\/reference\/retrofit-of-le-generator-at-walibi-rhone-alpes\/","title":{"rendered":"Retrofit of Le Generator at Walibi Rh\u00f4ne-Alpes"},"content":{"rendered":"<p data-path-to-node=\"7\">Ceratec&#8217;s Electrical Installations division was commissioned to modernize the technical infrastructure of &#8220;Le Generator,&#8221; a historic attraction at Walibi Rh\u00f4ne-Alpes originally installed in 1987. The primary objective was to address equipment obsolescence and enhance operational safety while maintaining the ride&#8217;s original characteristics.<\/p>\n<h5 data-path-to-node=\"8\">Technical Scope of Work<\/h5>\n<p data-path-to-node=\"9\">The engineering team managed a complete retrofit of the attraction&#8217;s electrical and command systems. The scope of supply included:<\/p>\n<ul data-path-to-node=\"10\">\n<li>\n<p data-path-to-node=\"10,0,0\"><b data-path-to-node=\"10,0,0\" data-index-in-node=\"0\">Automation and Control:<\/b> Replacement of the legacy system with a modern automated control solution. This involved the design and installation of a new main electrical cabinet.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"10,1,0\"><b data-path-to-node=\"10,1,0\" data-index-in-node=\"0\">Cabling:<\/b> Complete renewal of the electrical cabling throughout the structure to ensure long-term reliability.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"10,2,0\"><b data-path-to-node=\"10,2,0\" data-index-in-node=\"0\">Operator Interfaces:<\/b> Installation of a modern control panel (pupitre) for daily operations, coupled with a dedicated remote control system to facilitate maintenance procedures for technical staff.<\/p>\n<\/li>\n<\/ul>\n<h5 data-path-to-node=\"11\">Safety and Timing<\/h5>\n<p data-path-to-node=\"12\">A key component of this project was the optimization of safety protocols to meet current standards. The project was executed under a strict timeline, ensuring the attraction was fully commissioned and ready for the high season opening.<\/p>\n<p data-path-to-node=\"13\">This project highlights Ceratec&#8217;s expertise in industrial revamping and its ability to adapt complex electrical solutions to the specific constraints of the leisure and amusement park industry.<\/p>\n","protected":false},"template":"","pays":[533],"solutions":[606],"secteurs":[585],"clients":[1043],"business-unit":[536],"class_list":["post-18581","reference","type-reference","status-publish","hentry","pays-france-en","solutions-electrical-engineering","secteurs-tourism-and-leisure","clients-walibi","business-unit-electrical-installations-en"],"_links":{"self":[{"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/reference\/18581","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/types\/reference"}],"wp:attachment":[{"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/media?parent=18581"}],"wp:term":[{"taxonomy":"pays","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/pays?post=18581"},{"taxonomy":"solutions","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/solutions?post=18581"},{"taxonomy":"secteurs","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/secteurs?post=18581"},{"taxonomy":"clients","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/clients?post=18581"},{"taxonomy":"business-unit","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/business-unit?post=18581"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}