{"id":17327,"date":"2026-01-13T10:48:20","date_gmt":"2026-01-13T08:48:20","guid":{"rendered":"https:\/\/ceratec.eu\/?post_type=reference&#038;p=17327"},"modified":"2026-01-13T10:51:56","modified_gmt":"2026-01-13T08:51:56","slug":"project-asteria-high-voltage-industrial-and-office-electrical-installation","status":"publish","type":"reference","link":"https:\/\/ceratec.eu\/en\/reference\/project-asteria-high-voltage-industrial-and-office-electrical-installation\/","title":{"rendered":"Project Asteria: High-Voltage, Industrial, and Office Electrical Installation"},"content":{"rendered":"<h5 data-path-to-node=\"55\">Renovation and Electrical Expansion of the <a href=\"https:\/\/asteriagroup.eu\/\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">Asteria<\/a> Site<\/h5>\n<p data-path-to-node=\"56\">Ceratec&#8217;s Electrical Installations department has successfully completed the technical renovation and expansion of the electrical capacity at the Asteria site. This project demonstrates our ability to manage complex technical scopes, ranging from high voltage to office finishing works.<\/p>\n<h5 data-path-to-node=\"57\">High-Voltage Infrastructure<\/h5>\n<p data-path-to-node=\"57\">To meet the building&#8217;s increased energy requirements, our teams sized and installed a new high-voltage cabin. This facility houses a 1250kVA transformer, ensuring stable and secure power distribution for all operations.<\/p>\n<h5 data-path-to-node=\"58\">Production Area Electrification<\/h5>\n<p data-path-to-node=\"58\">The integration of a new printing facility within the old warehouses required a complete overhaul of the industrial electrical network. Ceratec provided power supply for all printers and production machines. This scope also included:<\/p>\n<ul data-path-to-node=\"59\">\n<li>\n<p data-path-to-node=\"59,0,0\">Installation of adapted industrial lighting.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"59,1,0\">Deployment of the IT network.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"59,2,0\">Implementation of access control and intrusion alarm systems to secure the production area.<\/p>\n<\/li>\n<\/ul>\n<h5 data-path-to-node=\"60\">Office Layout and Finishing<\/h5>\n<p data-path-to-node=\"60\">The renovation of the office spaces was executed with strict attention to technical and aesthetic details, in collaboration with architect<a href=\"https:\/\/k-oncept.com\/\" target=\"_blank\" rel=\"noopener noreferrer nofollow\"> K-oncept<\/a>. Services included:<\/p>\n<ul data-path-to-node=\"61\">\n<li>\n<p data-path-to-node=\"61,0,0\">Lighting design and installation.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"61,1,0\">Power and data distribution via sockets and floor boxes.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"61,2,0\">Installation of a comprehensive security system (cameras, alarm, access control).<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"61,3,0\">Commissioning of electric vehicle chargers in the parking area.<\/p>\n<\/li>\n<\/ul>\n<p data-path-to-node=\"62\">Ceratec hereby confirms its global expertise as a technical partner for large-scale industrial and tertiary projects.<\/p>\n","protected":false},"template":"","pays":[],"solutions":[603,644,658,601,600,586],"secteurs":[597],"clients":[1036],"business-unit":[536],"class_list":["post-17327","reference","type-reference","status-publish","hentry","solutions-access-control","solutions-burglar-alarm","solutions-charging-solutions","solutions-data-and-communication","solutions-general-energy-distribution","solutions-lighting","secteurs-offices","clients-asteria","business-unit-electrical-installations-en"],"_links":{"self":[{"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/reference\/17327","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/types\/reference"}],"wp:attachment":[{"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/media?parent=17327"}],"wp:term":[{"taxonomy":"pays","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/pays?post=17327"},{"taxonomy":"solutions","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/solutions?post=17327"},{"taxonomy":"secteurs","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/secteurs?post=17327"},{"taxonomy":"clients","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/clients?post=17327"},{"taxonomy":"business-unit","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/business-unit?post=17327"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}