{"id":14792,"date":"2025-07-07T09:17:24","date_gmt":"2025-07-07T07:17:24","guid":{"rendered":"http:\/\/ceratec.eu\/?post_type=reference&#038;p=14792"},"modified":"2025-11-06T15:29:47","modified_gmt":"2025-11-06T13:29:47","slug":"ghent-fire-station-319-kwp-solar-installation-powers-sustainable-public-infrastructure","status":"publish","type":"reference","link":"https:\/\/ceratec.eu\/en\/reference\/ghent-fire-station-319-kwp-solar-installation-powers-sustainable-public-infrastructure\/","title":{"rendered":"Ghent Fire Station: 115 kWp of solar power for sustainable public infrastructure"},"content":{"rendered":"<p>The new photovoltaic system commissioned on the flat roof of the Ghent fire station deploys <strong data-start=\"1138\" data-end=\"1173\">244 modules rated at 470 W each<\/strong>, delivering a <strong data-start=\"1188\" data-end=\"1225\">total peak capacity of 114.68 kWp<\/strong>.<br data-start=\"1226\" data-end=\"1229\" \/>Mounted on a <strong data-start=\"1242\" data-end=\"1270\">dual east\u2013west structure<\/strong> tilted at <strong data-start=\"1281\" data-end=\"1290\">12.5\u00b0<\/strong>, the panels cover roughly <strong data-start=\"1317\" data-end=\"1329\" data-is-only-node=\"\">1,600 m\u00b2<\/strong> and provide <strong data-start=\"1342\" data-end=\"1382\">consistent output throughout the day<\/strong>. A <strong data-start=\"1386\" data-end=\"1418\">110 kVA three-phase inverter<\/strong> converts the energy produced and <strong data-start=\"1452\" data-end=\"1500\">feeds it into the site\u2019s low-voltage network<\/strong>.<br data-start=\"1501\" data-end=\"1504\" \/><strong data-start=\"1504\" data-end=\"1527\">Grid impact studies<\/strong> and <strong data-start=\"1532\" data-end=\"1553\">remote monitoring<\/strong> ensure <strong data-start=\"1561\" data-end=\"1580\">AREI compliance<\/strong> and <strong data-start=\"1585\" data-end=\"1613\">accurate energy tracking<\/strong>. At full load, the system is expected to <strong data-start=\"1655\" data-end=\"1691\">generate nearly 300 MWh per year<\/strong>, covering <strong data-start=\"1702\" data-end=\"1760\">a significant share of the station\u2019s electricity needs<\/strong>.<\/p>\n","protected":false},"template":"","pays":[532],"solutions":[677],"secteurs":[],"clients":[1024],"business-unit":[536],"class_list":["post-14792","reference","type-reference","status-publish","hentry","pays-belgium","solutions-photovoltaic-panels","clients-brandweerkazerne-gent","business-unit-electrical-installations-en"],"_links":{"self":[{"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/reference\/14792","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/reference"}],"about":[{"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/types\/reference"}],"wp:attachment":[{"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/media?parent=14792"}],"wp:term":[{"taxonomy":"pays","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/pays?post=14792"},{"taxonomy":"solutions","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/solutions?post=14792"},{"taxonomy":"secteurs","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/secteurs?post=14792"},{"taxonomy":"clients","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/clients?post=14792"},{"taxonomy":"business-unit","embeddable":true,"href":"https:\/\/ceratec.eu\/en\/wp-json\/wp\/v2\/business-unit?post=14792"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}